Language: EN | 中文 |

Photo Album

9  

Checking Aircon At Bukit Timah

4  

Installation At Yishun

3  

FOC Site Survey Jurung

3  

Complete the installation of System 2 at Serangoon ave 3

6  

Complete the installation of System 2 at Tampines Street

4  

Complete the installation of System 1 at 23 Balmoral Park

4  

Replace water pump set done at Ang mo Kio tested normal

3  

Chemical Overhoul In Condominium Bukit Batok

2  

chemical Comppessor Unit At Ghim Moh Rd

2  

Re Vacuum System

6  

Service Fancoil Unit

6  

bukit batok st 22

4  

chemical overhoul at jurung west

4  

To Replace VRV Filter Dryer

4  

To Replace Fanmotor Set

4  

To install New Pipe 2 Trip Job

9  

Install New VRV System At Condominiums

2  

To Chemical Wash Outdoor Unit CU

5  

To Dismantled Water Trey To Replace Water Pump Set

2  

Normal service at blk 325 clementi

4  

Check and Replace Water Pump Set

3  

Replace PCB Board and Fan Motor at HDB Bukit Batok

3  

Replace Outdoor Condenser Unit and Testing Commissioning

3  

Replace Indoor Control Board in Ang Mo Kio

4  

Chemical Wash Duct Unit at Condominium CBD

4  

Installation VRV at Kim Teck rd Industry Area

3  

Installation Mini VRV in Tuas Area

5  

Installation Ceiling Unit in Tuas Area

4  

Air Conditioner Installation at HDB Hougang

3  

Install System 2 Aircond at Private House

3  

Chemical Wash Compressor Unit at Tuas Area