相册
3
Complete the installation of System 2 at Serangoon ave 3
6
Complete the installation of System 2 at Tampines Street
4
Complete the installation of System 1 at 23 Balmoral Park
4
Replace water pump set done at Ang mo Kio tested normal
3
Chemical Overhoul In Condominium Bukit Batok
2
chemical Comppessor Unit At Ghim Moh Rd
2
Re Vacuum System
6
Service Fancoil Unit
6
bukit batok st 22
4
chemical overhoul at jurung west
4
To Replace VRV Filter Dryer
4
To Replace Fanmotor Set
4
To install New Pipe 2 Trip Job
9
Install New VRV System At Condominiums
2
To Chemical Wash Outdoor Unit CU
5
To Dismantled Water Trey To Replace Water Pump Set
2
Normal service at blk 325 clementi
4
Check and Replace Water Pump Set
3
Replace PCB Board and Fan Motor at HDB Bukit Batok
3
Replace Outdoor Condenser Unit and Testing Commissioning
3
Replace Indoor Control Board in Ang Mo Kio
4
Chemical Wash Duct Unit at Condominium CBD
4
Installation VRV at Kim Teck rd Industry Area
3
Installation Mini VRV in Tuas Area
5
Installation Ceiling Unit in Tuas Area
4
Air Conditioner Installation at HDB Hougang
3
Install System 2 Aircond at Private House
3
Chemical Wash Compressor Unit at Tuas Area
8
Chemical Overhaul at HDB Woodlands
8
Checking VRV System and Replace Compressor at Sentosa